• Campus Leiden

    Commissioned by the Leiden University Foundation, an expansion of Campus Hogeschool Leiden at the Leiden Bio Science Park is being realized. VDNDP has provided the Building engineer elaboration from the TO phase to the execution. Together with the engineering team VDNDP created an integral technical 3D BIM model.

    Areas of expertises

    Designing | Engineering | Specifying

    Type of building

    Utility

    Use

    Learning

    Client

    J.P. van Eesteren

    Location

    Leiden

    BVO

    approx. 9600 m2

    Start - completion

    2021 - 2023

    VDNDP Project Manager

    Robin Koehnen

    About Campus Leiden

    A new education building of approximately 9600 m² GLA has been realized on the Leiden Campus. The building will be connected to the rear of the existing building via an atrium. The atrium is a meeting place with offices, teaching spaces and a restaurant with kitchen. In the video below you can walk through the 3D building model we created.

    Previous
    Next
    slider image
    photo by Bert Rietberg
    slider image
    photo by Bert Rietberg
    slider image
    photo by Bert Rietberg
    slider image
    photo by Bert Rietberg
    slider image
    photo by Bert Rietberg
    slider image
    photo by Bert Rietberg

    Our collaborators
    for this project:

    Contractor

    J.P. van Eesteren

    Architect

    DP6 achitectuurstudio

    Constructor

    SWINN

    Installer

    Croonwolter&Dros

    Building physics consultant

    LBP

    These VDNDP'ers would be happy to tell you more: